While it can be easy to push the latest and greatest technology there can be roadblocks on the path to a newer control system. CIMTEC has developed and executed many migration projects using these steps to ensure a migration can be done with no surprises and for as low a cost as possible.
- Customer provides current program running in old system
 - GE product specialist will review program to develop comprehensive proposal
 - Upon acceptance of proposal migration begins and involves      many steps:
- Hardware evaluation:
- What modules can stay as is?
 - What modules require new firmware or chips?
 - What modules need to be replaced?
 
 - Program evaluation:
- How many rungs of logic are we dealing with?
 - How many instructions won’t convert well?
 - Are the rung comments in the right place?
 - Do tag names follow current software rules/conventions or will they need to be manually changed?
 - How complex will the I/O map change be?
 - Should functions that are available now but were not historically be used to simplify logic?
 - Are there portions of the program that should be removed entirely as they won’t be necessary?
 - How much manual intervention will be required?
 
 - Program conversion
 - Proof read of converted program (3 hours to 3 weeks depending on length)
 - Manual intervention of converted program
 - Acquisition of proposed hardware
 - Testing of program in proposed hardware
 
 - Hardware evaluation:
 
Delivery and installation of new hardware and converted program.